{"created":"2023-06-19T07:13:55.987580+00:00","id":1158,"links":{},"metadata":{"_buckets":{"deposit":"d51cf323-492c-4634-99d4-21e853dd1a50"},"_deposit":{"created_by":24,"id":"1158","owners":[24],"pid":{"revision_id":0,"type":"depid","value":"1158"},"status":"published"},"_oai":{"id":"oai:repo.lib.tut.ac.jp:00001158","sets":["9"]},"author_link":["2373","2133","2376","2374","2372","2375"],"item_10001_biblio_info_7":{"attribute_name":"書誌情報","attribute_value_mlt":[{"bibliographicIssueDates":{"bibliographicIssueDate":"2005-03-15","bibliographicIssueDateType":"Issued"},"bibliographicIssueNumber":"1","bibliographicPageEnd":"20","bibliographicPageStart":"15","bibliographicVolumeNumber":"48","bibliographic_titles":[{"bibliographic_title":"JSME international journal. Series C, Mechanical systems, machine elements and manufacturing"},{"bibliographic_title":"JSME international journal. Series C, Mechanical systems, machine elements and manufacturing","bibliographic_titleLang":"en"}]}]},"item_10001_description_5":{"attribute_name":"抄録","attribute_value_mlt":[{"subitem_description":"There usually exist large variations in assembly times at mixed-model assembly lines depending on difference of product-models. To increase efficiency of line handling under such circumstance, this paper concerns with a sequencing problem for the mixed-model assembly lines where each product is supposed to be assembled within the same cycle time. Then, we formulate a new type of the sequencing problem minimizing the weighted sum of the line stoppage times and the idle times, and propose a new sequencing method with the aid of Relief Man (RM). Since the resulting problem refers to a combinational optimization problem, we develop a hybrid method that applies meta-heuristics like SA (Simulated Annealing) together with TS (Tabu Search) in a hierarchical manner. Finally, we examine the effectiveness of the proposed method through computer simulations and show the advantage of using RM against various changes in production environment.","subitem_description_type":"Abstract"}]},"item_10001_description_6":{"attribute_name":"内容記述","attribute_value_mlt":[{"subitem_description":"・rights:日本機械学会\n・rights:本文データは学協会の許諾に基づきCiNiiから複製したものである\n・relation:isVersionOf:http://ci.nii.ac.jp/naid/110004820858/\n\n","subitem_description_type":"Other"}]},"item_10001_publisher_8":{"attribute_name":"出版者","attribute_value_mlt":[{"subitem_publisher":"一般社団法人日本機械学会"}]},"item_10001_relation_17":{"attribute_name":"関連サイト","attribute_value_mlt":[{"subitem_relation_name":[{"subitem_relation_name_text":"CiNii"}],"subitem_relation_type_id":{"subitem_relation_type_id_text":"http://ci.nii.ac.jp/naid/110004820858/","subitem_relation_type_select":"URI"}}]},"item_10001_source_id_9":{"attribute_name":"ISSN","attribute_value_mlt":[{"subitem_source_identifier":"13447653","subitem_source_identifier_type":"ISSN"}]},"item_10001_version_type_20":{"attribute_name":"著者版フラグ","attribute_value_mlt":[{"subitem_version_resource":"http://purl.org/coar/version/c_970fb48d4fbd8a85","subitem_version_type":"VoR"}]},"item_creator":{"attribute_name":"著者","attribute_type":"creator","attribute_value_mlt":[{"creatorNames":[{"creatorName":"Yoo, Jae Kyu"}],"nameIdentifiers":[{},{},{}]},{"creatorNames":[{"creatorName":"Shimizu, Yoshiaki"}],"nameIdentifiers":[{},{},{}]},{"creatorNames":[{"creatorName":"Hino, Rei"}],"nameIdentifiers":[{},{},{}]},{"creatorNames":[{"creatorName":"YOO, Jae Kyu","creatorNameLang":"en"}],"nameIdentifiers":[{}]},{"creatorNames":[{"creatorName":"SHIMIZU, Yoshiaki","creatorNameLang":"en"}],"nameIdentifiers":[{}]},{"creatorNames":[{"creatorName":"HINO, Rei","creatorNameLang":"en"}],"nameIdentifiers":[{}]}]},"item_files":{"attribute_name":"ファイル情報","attribute_type":"file","attribute_value_mlt":[{"accessrole":"open_date","date":[{"dateType":"Available","dateValue":"2013-06-18"}],"displaytype":"detail","filename":"j13447653-0048-15.pdf","filesize":[{"value":"538.6 kB"}],"format":"application/pdf","licensetype":"license_11","mimetype":"application/pdf","url":{"label":"j13447653-0048-15","url":"https://repo.lib.tut.ac.jp/record/1158/files/j13447653-0048-15.pdf"},"version_id":"be2e040d-8233-4e84-9d8e-334c4db311d6"}]},"item_keyword":{"attribute_name":"キーワード","attribute_value_mlt":[{"subitem_subject":"Line_Handling","subitem_subject_scheme":"Other"},{"subitem_subject":"Mixed-Model_Assembly_Line","subitem_subject_scheme":"Other"},{"subitem_subject":"Sequencing_Problem","subitem_subject_scheme":"Other"},{"subitem_subject":"Relief-Man","subitem_subject_scheme":"Other"},{"subitem_subject":"Meta-Heuristics","subitem_subject_scheme":"Other"},{"subitem_subject":"Line_Handling","subitem_subject_language":"en","subitem_subject_scheme":"Other"},{"subitem_subject":"Mixed-Model_Assembly_Line","subitem_subject_language":"en","subitem_subject_scheme":"Other"},{"subitem_subject":"Sequencing_Problem","subitem_subject_language":"en","subitem_subject_scheme":"Other"},{"subitem_subject":"Relief-Man","subitem_subject_language":"en","subitem_subject_scheme":"Other"},{"subitem_subject":"Meta-Heuristics","subitem_subject_language":"en","subitem_subject_scheme":"Other"}]},"item_language":{"attribute_name":"言語","attribute_value_mlt":[{"subitem_language":"eng"}]},"item_resource_type":{"attribute_name":"資源タイプ","attribute_value_mlt":[{"resourcetype":"journal article","resourceuri":"http://purl.org/coar/resource_type/c_6501"}]},"item_title":"A Sequencing Problem for Mixed-Model Assembly Line with the Aid of Relief-Man(Advanced Production Scheduling)","item_titles":{"attribute_name":"タイトル","attribute_value_mlt":[{"subitem_title":"A Sequencing Problem for Mixed-Model Assembly Line with the Aid of Relief-Man(Advanced Production Scheduling)"},{"subitem_title":"A Sequencing Problem for Mixed-Model Assembly Line with the Aid of Relief-Man(Advanced Production Scheduling)","subitem_title_language":"en"}]},"item_type_id":"10001","owner":"24","path":["9"],"pubdate":{"attribute_name":"公開日","attribute_value":"2013-06-18"},"publish_date":"2013-06-18","publish_status":"0","recid":"1158","relation_version_is_last":true,"title":["A Sequencing Problem for Mixed-Model Assembly Line with the Aid of Relief-Man(Advanced Production Scheduling)"],"weko_creator_id":"24","weko_shared_id":-1},"updated":"2023-06-19T07:57:11.686513+00:00"}